Condition
Treatment
In 2007, ICS was commissioned by North Sydney Council to undertake a condition assessment of the skip and provide recommendations for its future care and management. In 2014, ICS was able to oversee the conservation work required to bring this skip closer to its original state. The treatment involved carefully cutting out rotted timber elements and metal elements that had corroded beyond repair and replacing them with similar materials.
The works were carried out in line with the Burra Charter principles (as little as possible, as much as necessary). This meant keeping many of the skipâs original elements so that its unique history, age and previous restorations were still evident, whilst at the same time ensuring that it was now in a stable and presentable condition.
Treatment
Display
The skip stood on display for almost forty years next door to the Coal Loader Community Garden at Balls Head Bay and became highly cherished by both the local community and general public. Now back on display in its restored state in a new location outside the coal loading tunnels, it once again acts as a reminder of the siteâs unique history and industrial heritage.
Before treatment
After treatment